Steel studs are beneficial for building ceilings because they are straight light and can be purchased in longer lengths than wood studs.
Metal stud ceiling.
How to guide on installing a metal frame ceiling.
For low clearance areas they also come in 1 5 8 inch widths.
Usg provides resources here for our ul wall assemblies for seamless integration into any construction project.
The metal tracks and studs are installed firmly therefore the frame is perfectly level as we have used the laser level.
The metal stud ceiling frame is completed after about 3 hours of continuous work.
A web stiffener is a 6 length of stud secured to the stud web at both ends of the stud with four 4 8 pan head screws.
2 1 2 250s 3 1 2 350s 3 5 8 362s 4 400s 5 1 2 550s 6 600s 8 800s 10.
In many applications installing a steel stud ceiling take less time and effort than it would with wood studs.
If stud height exceeds table web stiffeners are required.
Metal products the modern engineered alternative to traditional timber and blockwork construction gypframe based wall ceiling and floor systems are quicker and easier to install whilst meeting the highest performance requirements.
Ceiling joist top flange braced 48 o c.
The best technique for framing steel walls is to first fasten the floor and ceiling tracks and then install the studs one at a time.
Prostud limiting height charts new clarkdietrich itools structural stud lookup tool interior wall heights w structural framing interior.
Interior framing use iprostud in clarkdietrich itools to quickly lookup the interior framing system you need.
Clarkdietrich cold formed steel c studs general cold formed steel framing faqs general steel home construction faqs new clarkdietrich itools structural stud lookup tool clarkdietrich studs are made in a variety of flange widths to meet different applications.
Item 61149 model 226707.
These wall assembly files are used for planning and estimation purposes for many ul wall types such as fire rated wall assemblies.
Allowable limiting heights spans contact clarkdietrich technical services at 888 437 3244 for any questions on tables below.
On the floor lay out and mark the location of the wall fasten the steel track photo 2 and then locate the position of the ceiling track using a plumb bob or a level held against a steel stud.
Track gauge same as stud with 1 track leg height.