Place 9 wide strips of roll roofing along the eaves and rakes positioning them to overhang the deck to 3 8.
Mineral roll roofing installation.
How to do it attach first course.
Place a 9 229 mm wide starter strip along eave and rake edges so it overhangs the drip edge 1 4 6 3 mm.
Fasten the strips with rows of nails located 1 and 8 from the roof edge and spaced 4 on center in each row.
Things you ll need rolled roofing razor knife trowel brush hose measuring tape ladder roofing cement 1 inch 2 5 cm long roofing nails hammer chalk.
To seal a plumbing vent spread roofing.
See figure 1 roll roofing installation.